Engineering, Procurement & Construction

Power Distribution


Power Transmission Lines
Saddam Oil Field Development Project for North Oil Company (NOC), Iraq - Construction of 33 KV 51 km and 11 KV 33 Km Transmission Lines [1990]
400 KV/ 220 KV/ 132 KV/ 66 KV Transmission Lines for Gujarat Electricity Board (GEB), India - Design, Supply and Erection of 2,450 km Multi Circuit Transmission Lines [1975 – 1989]
400 KV Agra-Jaipur Transmission Line for National Thermal Power Corporation (NTPC), India - Design, Supply and Erection of 258 km Single Circuit Transmission Line [1982]
33 KV Overhead Transmission Line for Petroleum Development Oman (PDO), Oman - Construction of 48 km Transmission Lines at Rima and Rahab Oil Field Development Facilities [1982]
138 KV Transmission Line for Oasis Oil Company, Libya - Erection of 177 km Single Circuit Transmission Line [1977]

Substations
Substation structures for Gujarat Electricity Board (GEB), India - Design and Supply of 400 KV / 220 KV / 132 KV / 66 KV Substation Structures (11,113 MT ) [1975-1987]
Substation structure for Ahmedabad Electricity Corporation, India - Design and Supply of 132 KV Substation Structure (115 MT) [1977]

Railway Electrification
Railway Electrification of 430 Km Nagda to Bhopal section for Indian Railways, India - Design, Supply and Erection of Traction Overhead Equipment, Switching Stations, Booster Transformer Stations and LT Supply Transformer Stations [1987]
Railway Electrification of 80 Km Koria to Keshoralpatan section for Indian Railways, India - Design, Supply and Erection of Traction Overhead Equipment, Switching Stations, Booster Transformer Stations and LT Supply Transformers [1984]