Engineering, Procurement & Construction

Oil and Gas

Oil & Gas Field Development
Mukhaizna Central Processing and Satellite Facilities for Occidental Mukhaizna LLC, Oman - Engineering, Procurement, Construction, Testing and Commissioning of Facilities capable of generating 575,000 BWEPD of steam and treating 150,000 BPD of Crude Oil plus associated Water and Gas (comprising Central Processing Facility with Oil Treatment Unit, De-oiling Train, Tank Farm, De-sanding Facilities, VRU Compression System, Flare Facilities, Utility Systems and two Satellites with Group Separation Facilities, Pumps & Flaring System) [2006-2008]
Buhasa Facilities Development Project for Snampogetti, UAE - Civil, Mechanical, Electrical, Instrumentation and Pipeline works for Buhasa Facilities Upgrade (comprising Earth works 1.21 million M3, Concreting 25,800 M3, Buildings 4 Nos., Piping 420,000 Inch Dia, Equipment Erection 3,600 MT, Structural 4,500 MT, Cabling 1,125 Km and Pipelines 3” to 26” dia x 420 Km ) [2007]
Melut Basin Oil Development Project, Upstream Facilities for Petrodar Operating Company Limited, Sudan - Engineering, Procurement, Construction and Commissioning of 31,000 bbl/day Adar / Agordeed Field Production Facilities (comprising Crude Oil Processing Unit, Heat Medium Package, Flare System, Fire Fighting System, Storage Tanks, Water Treatment, Produced Water & Utility System, Custody Transfer & Flow Metering System and Electrical, Instrumentation & Telecom System) [2006]
Saddam Oil Field Development Project for Mannesmann Anlagenbau, Iraq - Civil, Mechanical, Electrical, Instrumentation and Pipeline works of Central Treatment Plant, Tank Farm, Oil & Gas Gathering Station, Trunk Lines, Gathering Lines, Flow Lines, Well Heads and Overhead Transmission Lines (comprising Pipelines 30” to 3” dia x 480 Kms, Concreting 23,000 M3, Structural 780 MT, Equipment Erection 4,000 MT, Piping 2,500 MT) [1990]

Tank Farms
Mukhaizna Central Processing and Satellite Facilities for Occidental Mukhaizna LLC, Oman - Engineering, Procurement, Construction, Testing and Commissioning of Storage Tank Farm (comprising 18 Nos. Fixed Roof Tanks of dia 48.0 mtrs to 7.0 mtrs) [2006 – 2008]
Inter Refineries Pipelines Project for Abu Dhabi Oil Refining Company (Takreer), UAE - Engineering, Procurement, Construction, Testing and Commissioning of Multi Product Storage Tank Farm (comprising 14 Nos. Floating Roof Tanks of dia 59.7 mtrs to 32 mtrs.) [2005-2007]
Melut Basin Adar / Agordeed Field Production Facilities for Petrodar Operating Company Limited, Sudan -Engineering, Procurement, Construction, Testing and Commissioning of Storage Tank Farm (comprising of 14 Nos. Fixed Roof Tanks of dia 30 mtrs to 3 mtrs.) [2006]
Saddam Oil Field Development Project, for Mannesmann Anlagenbau, Iraq - Erection of Storage Tank Farm (comprising 16 Nos. fixed roof tanks of dia 24 mtrs to 6 mtrs.) [1990]

Oil & Gas Pipelines
Inter Refineries Pipelines Project for Abu Dhabi Oil Refining Company, UAE - Engineering, Procurement, Construction, Testing and Commissioning of 16”/12”/10” dia x 721 Km Multi Products Pipelines System, 3 Nos. Terminals (comprising Pump Houses, Storage Tanks, Metering Skids, Road Tanker Loading Arms), DCS, SCADA and Fibre Optic Cable based Telecom System [2005-2007]
Saih Rawl - Salalah Gas Pipeline Project for Oman Gas Company (OGC), Oman - Engineering, Procurement, Construction, Testing and Pre-commissioning of 24” dia x 683.5 Km Gas Pipeline System, SCADA & Fibre Optic Cable based Telecom System [2002]
Cochin-Coimbatore-Karur Pipeline Project for Petronet CCK Limited, India - Engineering, Procurement, Construction, Testing and Commissioning of 18” / 14” dia x 288 Km Product Pipelines System, 3 Nos. Terminals (Comprising Pump Stations, Fire Fighting System, Buildings), SCADA and Fibre Optic Cable based Telecom System [2002]
Peninsular Gas Utilisation Project - Loop-1 Gas Transmission System for Petronas Gas Behard, Malaysia - Procurement, Construction and Commissioning of 36” dia x 275 Km Gas & 12”/8” dia x 82 Km Propane & Butane Pipeline System [1999]
North East Early Production Scheme for ADCO, Abu Dhabi, UAE - Construction, Testing, Pre-commissioning and Commissioning Assistance of 12”/8” dia x18.5 Km Offshore Shallow Water Pipeline System (comprising 750,000 M3 of dredging at sea depth upto 7 meters), Well Heads and associated Civil, Mechanical, Electrical & Instrumentation works [1994]
Hazira-Bijaipur-Jagdishpur (HBJ) Gas Pipeline Project for Spie Capag-NKK-Toyo Consortium, India -Construction, Testing, Pre-commissioning and Commissioning Assistance of 36” dia x 320 Km, 30” dia x 347 km, 18” dia x 218.5 km & 12” dia x 20 Km Gas Pipeline Systems [1988]

Gas Separation and Processing Plants
Ras Laffan Common Cooling System Phase II (561,120 M3/Hr) for once through Consumers of Qatar Petroleum, Qatar - Engineering, Procurement, Installation, Commissioning and Initial Operation Maintenance of Common Cooling System comprising Intake Channel, Intake Pumping Stations and Water Outfall, Distribution and Collection Piping System, Related Auxilliary / Ancillary Facilities, 220 KV GIS Substation, DCS, Telecom System, Buildings, Roads and Utility Crossings, Cathodic Protection of Concrete Structures (Concreting 400,000 M3, FRP Piping 4.0 mtr /3.45 mtr /2.45 mtr dia x 76 Kms, Building 14 Nos., Structural 15,000 MT, 7.5 MW Pumps with Variable Speed Drives 18 Nos.) [2006-08]
2000 MMSCFD Dolphin Onshore Gas Plant Project, Upstream & Compression Facilities for JGC Corporation, Qatar - Mechanical and Piping works (comprising Piping 469,100 Inch Dia, Equipment Erection 21,024 MT, Structural 4,180 MT) [2004-2007]
155 MMSCFD Northern Oman Gas Facilities Project for Occidental of Oman LLC, Oman - Engineering, Procurement, Construction and Commissioning of Gas Gathering, Treatment and Compression system (comprising Concreting 5,200 M3, Piping 40,000 Inch Dia, Process Equipment 3,000 MT, Cabling 130 Km) [2004]
Hazira Phase III Expansion (6.3 Million SCMD x 2 trains) for Hyundai Heavy Industries, India - Civil, Structural, Mechanical, Electrical & Instrumentation works (comprising Concreting 10,830 M3, Structural 1,670 MT, Piping 183,000 Inch Dia, Equipment Erection 1,951 MT) [1997]
North Gas Project for Mitsubishi Heavy Industries Limited, Iraq - Piping and Erection works of Process Plant and Compressor Station (comprising Piping 3,665 MT, Structural Steel 2,725 MT) [1982]

Refineries
22,000 TPD Ruwais Sulphur Expansion – Phase – III for Abu Dhabi Oil Refining Company (Takreer), UAE - Engineering, Procurement, Construction, Commissioning and Startup of Sulphur Handling, Granulation, Storage and Transportation System (comprising Concreting 20,000 M3, Piping 80,000 Inch Dia, Equipment 1800 MT, Structural 1,500 MT, Cabling 340 Kms) [2007-2009]
9.65 MMTPA Sohar Refinery for JGC Corporation, Oman - Civil, Mechanical, Electrical and Instrumentation works at Off site Area (comprising Concreting 31,246 M3, Piling 5,807 Nos., Piping 778,152 Inch Dia, Equipment 1,068 MT, Structural 2,375 MT and Cabling 750 Kms) [2006]
30 MMTPA Reliance Refinery for Reliance Industries Ltd, India - Civil and Mechanical works (comprising Concreting 97,000 M3, Piping 2.6 Million Inch Dia, Structural 20,000 MT, Equipment Erection 40,000 MT) [1999]
2.5 MMTPA Umm Said Refinery Project for Technip, Qatar - Mechanical works of Hydro-Treater and Catalytic Reformer Units, Kerosene and Gas Desulphurisation Units, Off Sites and Utilities (comprising Piping 525,000 Inch Dia, Equipment 4,900 MT) [1983]
6 MMTPA Ruwais Refinery Project of Abu Dhabi National Oil Company (ADNOC) for Mannesmann Anlagenbau, UAE - Mechanical works of Crude Oil Desalting and Destillation Unit, Naphtha Hydro Desulphurisation & Catalytic Reforming Units, Kerosene Hydrotreatment & Heavy Gas Oil Reforming Units (comprising Piping 650,000 Inch Dia, Equipment Erection 9,191 MT, Pipeline 20 Kms) [1981]

LNG Plants
2 x 7.8 MMTPA Ras Gas Onshore Expansion Project Phase 2 (RGX II) for Chiyoda-Technip Joint Venture, Qatar – Civil, Mechanical, Electrical and Instrumentation works for Utilities, Common Facilities, Offsite and Off Plot Areas (comprising Concreting 61,000 M3, Piping 1.5 Million Inch Dia, Equipment Erection 21,680 MT, Cabling 899 Kms) [2006-2008]
1 x 5.0 MMTPA SEGAS – Egypt LNG Project for Damietta LNG Construction LLC, Egypt - Fabrication, Erection of Piping, Equipment and Structural works for Train-1 (comprising Piping 280,500 Inch Dia, Equipment Erection 8,000 MT, Structural 7,698 MT) [2004]
2 x 3.8 MMTPA Malaysian LNG Tiga Project for JGC-KBR-SIME Joint Venture, Malaysia - Fabrication, Erection of Piping, Equipment and Structural works for Process Train (comprising Piping 742,000 Inch Dia, Equipment Erection 18,000 MT, Structural Steel 1,000 MT, Pre-cast Piperacks 9,326 M3) [2003]
2 x 3.3 MMTPA Oman LNG Project for Chiyoda Foster Wheeler Joint Venture, Oman - Fabrication, Erection of Piping, Equipment and Structural works (comprising Piping 497,158 Inch Dia, Equipment Erection 424 Nos., Structural Steel 5,787 MT) [2000]

Petrochemical Plants
500,000 TPA Q-chem Ethylene Plant for Kellogg Brown & Root / Technip JV, Qatar - Civil, Mechanical, Electrical and Instrumentation works (comprising Concreting 28,438 M3, Piping 550,435 Inch Dia, Equipment Erection 11,267 MT, Structural 3,788 MT, Cabling 860 Kms) [2002]
175,000 TPA Ethane Propane Recovery unit for Samsung Engineering Company, India - Civil, Mechanical, Electrical and Instrumentation works (comprising Concreting 8,876 M3, Piping 120,000 Inch Dia, Equipment Erection 1,300 MT, Structural 399 MT) [1999]
160,000 TPA Maharashtra Gas Cracker Complex LLDPE / HDPE Project for Indian Petrochemical Corporation Limited (IPCL), India – Design of Civil, Structural and Electrical Works, Construction of Civil, Structural, Mechanical, Piping, Electrical and Instrumentation works, Hydro Testing and Total Plant Commissioning (In consortium with Technip, France) [1991]

Fertilizer & Chemical Plants
100,000 TPA Methanol Plant for Deepak Fertilisers, India - Mechanical Erection and Piping works [1991]
864,600 TPA Ammonia / Urea Plant of Indo-Gulf Fertilizer Chemical Corporation for Snamprogetti, India - Mechanical Erection and Piping works for Off Sites and Utilities [1988]
Caustic Soda Plant of Pazagard Chemical Company for Saipem, Iran - Construction of Chlorine Caustic & Dertives Plant comprising Civil, Prefabrication of Steel Structures (528 T ), Equipment Erection (622 T), Piping (162 T) [1980]
594,000 TPA Ammonia and Urea Plant for Gujarat Narmada Valley Fertiliser Company (GNFC), India - Fabrication and Erection of underground piping (1,700 T) with associated civil works [1979]

[Back]     [Next]